Bathroom remodeling in Montgomery County and Northern Virginia
Every shower we build is waterproofed with Schluter Systems before a single tile goes on.
- MHIC #166097, verifiable through the state
- Family owned and owner run since 2004
- Licensed electricians for the electrical work
Before and after
Drag to compare. Same bathroom, same angle.
Recent bathrooms
How we waterproof
Grout is not waterproof. Water goes straight through it. What stops it is the layer behind the tile, and that is the layer you never see again after tile day. Flip the switch and watch where the water ends up.
Water goes through the grout, soaks into the wall, and has nowhere to leave. That is how you get rot behind tile that still looks fine from the outside.Water hits the membrane, runs down it, and leaves through the drain. The wall behind stays dry.
Behind the tile
Kerdi membrane on the walls, Ditra under the floor, and a Kerdi-Line drain where the design calls for one.
Through the corner
The membrane runs in one piece from the wall down into the floor. The corner is where water actually gets through, so there is no seam there.
Before any tile
It goes in first and gets checked before a single tile is set. Standard on every bathroom we do, not an upgrade line on your estimate.
How it works
Six steps, in this order, on every bathroom we build.
STEP 01
Free consultation
We walk the space and talk through layout, storage, and who uses it.
STEP 02
Design and selection
Tile, vanity, fixtures, and budget locked in before demo starts.
STEP 03
Permitting
Montgomery County DPS requires permits for most plumbing and electrical changes. We pull them.
STEP 04
Demo and rough in
Down to studs, then plumbing and electrical, inspected before we close anything up.
STEP 05
Waterproofing
Schluter membrane goes in and gets checked before a single tile.
STEP 06
Tile and walkthrough
Tile, vanity, glass, fixtures. Nothing signed off until you have seen it finished.
Common questions
If yours is not here, call and ask. We will give you a straight answer.
How much does a bathroom remodel cost in Montgomery County?
Most bathroom remodels run $15,000 to $50,000 and up. A refresh inside the existing layout sits at the low end. Moving plumbing, converting a tub to a walk in shower, or a full gut with heated floors and custom tile pushes it higher. We price it after seeing the room and break it down by category.
How long does it take, and will I lose my only bathroom?
Most bathrooms run 3 to 5 weeks. If it is your only full bathroom, tell us at the consultation and we sequence the work to shorten the window you are without it. We will be straight with you about how many days that actually is.
Who will actually be working in my house?
Our own crew. Dan and his father run every job directly, so you are dealing with an owner rather than an assigned coordinator. Tile and waterproofing are done by our own people, and electrical work by a licensed electrician.
What is Schluter, and why does it matter?
Schluter is a waterproofing system that goes behind the tile and under the floor. Kerdi membrane on the walls, Ditra underneath, and a Kerdi-Line drain where the design needs one. Tile and grout are not waterproof on their own. What stops water is the layer behind them, and that layer is the one you will never see again after tile day. We use it on every bathroom, not as an upgrade.
Can you convert a tub to a walk in shower?
Yes, including curbless and accessible showers. That usually means moving the drain and reframing the floor, which is permitted work. We handle both.
Are you licensed and insured?
Yes. BuildX Remodelers is MHIC #166097, verifiable through the Maryland Department of Labor, and we are fully insured. Ask and we will send you a certificate of insurance before work starts.
What happens if something goes wrong after the job is finished?
We warranty our labor for one year from completion. If something we installed fails in that window, call us and we come back and fix it. Vanities, fixtures, and glass also carry their own manufacturer warranties, which run separately from ours.
When do I pay, and how much is due up front?
Thirty percent at signing, thirty percent once the rough-in passes inspection, and the final forty percent at the walkthrough after you have seen the work finished. Maryland law caps a home improvement deposit at one third of the contract price, so thirty percent keeps us under that line, and nothing is due before the contract is signed.
Do you work in my town?
We serve Montgomery County, Maryland, and Northern Virginia. That covers Gaithersburg, Rockville, Bethesda, Silver Spring, Potomac, Germantown, Chevy Chase, Kensington, Olney, and Clarksburg, plus Fairfax County, Arlington, Alexandria, McLean, Vienna, Falls Church, Reston, and Herndon. If you are near the edge of that, call and ask.
Get a free estimate
MHIC #166097. Serving Montgomery County and Northern Virginia. We will get back to you the same business day.
Ready to start your bathroom?
Free in home consultation and a written estimate. No phone quotes.
Request an estimate